Skip to content
Coast
Marketplace Search
    • Marketplace
    • Sign In
    • Favorite Listings
    • Saved Searches
    • My ads
    • Account Settings
    • Sign In
    • Place an Ad
    • Place an ad:
      • Chinook Observer
      • Seaside Signal
      • The Astorian
  • Sign In
  • Sign In;}
    • Favorite Listings
    • Saved Searches
    • My ads
    • Account Settings
    • Sign In
  • Place an Ad
  • Place an ad
    Chinook Observer Seaside Signal The Astorian
  • Bargains
  • Farm Misc./General Misc
  • Garage Sales
  • Help Wanted
  • Livestock/Animals/Pets
  • Notices
  • Real Estate
  • Rentals
  • Services
  • Trailers/Rec. Vehicles
  • Trucks/Autos
Back
Featured

AB1351 CALL FOR BIDS - PUBLIC WORKS

Share

    Share Ad

  • Facebook
  • Twitter
  • reddit
  • WhatsApp
Print
AB1351
CALL FOR BIDS - PUBLIC WORKS IMPROVEMENT

Sealed bids will be received up to the hour of 2:00 PM, local time, on July 17, 2025 by Jeff Harrington, Public Works Director, at his office, third floor, City Hall, 1095 Duane, Astoria, Oregon 97103, for the following work:

2025 Slow Sand Filter Resanding Project

PROJECT DESCRIPTION
The intent of this contract is to resand the existing sand filters that process domestic water for the City of Astoria. There are three filters (1, 2, and 3) that are the same size and a fourth (4) which is larger than the first three. The sand filters are located within the City watershed in the hills approximately 12 miles south east of the City. The access into the watershed is restricted with locked gates. The four filters are together in an area above the dam near the reservoir so that the adjacent ground in the area drains directly into the reservoir. The processed water from the filters goes directly into the City water system. The work consists of removing and stockpiling approximately 18 - 24 inches of existing sand from the bottom of the filter, then furnishing and installing approximately 2.0 – 4.5 feet of new sand and capping it with a layer of the previously removed sand. This will require an estimated 10,400 tons of new sand. While work is being completed on one sand filter, the remaining three sand filters must remain operational. The quality of the watershed and the operation of the existing filters must be maintained at all times. There are stringent specifications for the quality, handling and the placement of the sand.

Project Substantial Completion shall be 24 months from the Notice to Proceed and Project Final Completion shall be 25 months from the Notice to Proceed.

A MANDATORY pre-bid meeting will be held on June 26, 2025, at 10:00 AM, local time, in the Astoria Walldorf Conference Room, 2nd Floor, City Hall, 1095 Duane Street, Astoria, Oregon, 97103. Bids will be accepted only from bidders attending the pre-bid meeting. If a bid is submitted by a contractor having not attended the pre-bid meeting, it will not be accepted and will be returned unopened. A project site tour will follow the pre-bid meeting.

Any bids received after the above specified time will not be considered. The carrier, including the United States Postal Service, is considered an agent of the bidder.

Solicitation Documents may be reviewed and/or obtained from the City Engineer's Office, Astoria City Hall, 1095 Duane Street, Astoria, Oregon, (503) 338-5173. A non-refundable fee of $100 will be charged for paper copies of these documents with full-size prints of the plans.

Questions regarding the project during the bid period shall be submitted to Nathan Crater, P.E., City of Astoria via phone at (503) 338-5173 or email at engpermits@astoria.gov.

Bids will be publicly opened and read by the Public Works Director at 2:00 PM, local time on July 17, 2025 in the Astoria Walldorf Conference Room. All bids must be accompanied by a certified check, a cashier's check or bid bond in an amount equal to at least 5% of the total bid.

If the total bid exceeds $50,000.00 the contract will be subject to Prevailing Wage Statute ORS 279C.800 to 279C.870. The contract IS NOT subject to federal prevailing wage rates under the Davis-Bacon Act (40 U.S.C. 3141 et seq).

Prequalification of bidders is required. Forms may be obtained from the Engineering Division Office, 1095 Duane Street, Astoria, OR 97103, (503) 338-5173. Prequalification applications must be received at the above location no less than seven (7) calendar days prior to bid opening. Required minimum prequalification class(es) of work for the Contractor (or Contractor in combination with proposed subcontractor(s)) for this contract are:

Earthwork
Water Filtration

In addition to the prequalification requirements listed above, the Contractor shall have documented previous sand filter media placement experience on a public project within the last 10 years to be considered a prequalified bidder for this project. This evidence must include contact information for an owner's reference to verify past performance. This supplemental information must be received at least 3 days prior to the bid opening.

Prior to submission of its bid, bidder shall be registered with the Oregon Construction Contractor's Board as required by ORS 701.055, and thereafter comply with the requirements of ORS 701.035 to 701.055.

Bidders shall be qualified in accordance with the applicable parts of ORS 279C in order to submit a bid for public works in Oregon.

BY: Jeff Harrington, P.E., Public Works Director
City of Astoria, Oregon

PUBLISHED: The Astorian, June 10 and 12, 2025.
Posted Online 4 days ago
This ad has been viewed 21 times

Published in the The Daily Astorian

Explore more

Featured

AB9974 Notice of Self Storage Sale

AB9974 Notice of Self Storage Sale

AB9974
Notice of Self Storage Sale
Please take notice Gearhart Storage located at 3899 Highway 101 North, Gearhart, OR 97138 intends to hold a sale to sell the property stored at the facility by the below list of occupants which are in default at an auction.
The sale will occur as an online auction via www.storagetreasures.com on 10/28/2024 at 10:00AM.
Ralph Goodenough unit #O-S 44x.
This sale may be withdrawn at any time without notice. Certain terms and conditions apply.
Published: October 11 & 18, 2024

AB9974
Notice of Self Storage Sale
Please take notice Gearhart Storage located at 3899 Highway 101 North, Gearhart, OR 97138 intends to hold a sale to sell the property stored at the facility by the below list of occupants which are in default at an auction.
The sale will occur as an online auction via www.storagetreasures.com on 10/28/2024 at 10:00AM.
Ralph Goodenough unit #O-S 44x.
This sale may be withdrawn at any time without notice. Certain terms and conditions apply.
Published: October 11 & 18, 2024

Posted Online 35 weeks ago

Published in the Seaside Signal

Featured

AB1025 November 21, 2024 PUBLIC NOTICE

AB1025 November 21, 2024 PUBLIC...

AB1025
November 21, 2024
PUBLIC NOTICE

Notice is hereby given that the City of Gearhart is naming a road, in accordance with Section 13.030 Administrative Provision of the City of Gearhart Zoning Ordinance, the Gearhart Planning Commission will hold the following public hearing on Thursday, December 12th, 2024, at 6:00 p.m. in Gearhart City Hall, 698 Pacific Way, via video and teleconference call. You can get participation information at https://www.cityofgearhart.com/calendar closer to the hearing date.

File #24-08CU – Conditional Use request for property located at 576 Pacific Way and further described as Assessors Plat 6.10.9AA, Taxlot 0700. The request is to expand a variety shop use in the Neighborhood Commercial C-1 Zone.

Criteria relevant to the Conditional Use request are Gearhart Zoning Ordinance Article 3 (Section 3.4, C-1 Neighborhood Commercial Zone), Article 6 Supplementary Provisions, Article 8 Conditional Uses, Article 13 Administrative Provisions, the Gearhart Comprehensive Plan and Transportation System Plan.

A copy of the application, all documents, staff reports, evidence relied upon, and applicable criteria pertinent to the requests will be available for review and may be obtained seven (7) days prior to the hearing on the city website www.cityofgearhart.com and Gearhart City Hall at the office of Angoleana Torres, 503-738-5501. Copies may be obtained at a reasonable cost. All interested parties are invited to express their opinion for or against the request at the hearing, by letter addressed to the Gearhart Planning Commission. P. 0. Box 2510, Gearhart, Oregon 97138, or by email at planning@cityofgearhart.com received by 5:00 p.m. the Tuesday prior to the hearing. The public hearing will be conducted in accordance with Section 13.050 of the Gearhart Zoning Ordinance.

Any person testifying may appeal the decision; however, failure to raise an issue, including constitutional or other issues regarding conditions of approval, with sufficient specificity to afford the City and parties to the request an opportunity to respond to the issues precludes appeal on said issue to the State Land Use Board of Appeals (LUBA), or to seek damages in circuit court due to a condition of approval.

Angoleana R. Torres Mail/Publish 11/21/2024
Gearhart Planning Commission
City of Gearhart PH121224
Published: November 21, 2024

AB1025
November 21, 2024
PUBLIC NOTICE

Notice is hereby given that the City of Gearhart is naming a road, in accordance with Section 13.030 Administrative Provision of the City of Gearhart Zoning Ordinance, the Gearhart Planning Commission will hold the following public hearing on Thursday, December 12th, 2024, at 6:00 p.m. in Gearhart City Hall, 698 Pacific Way, via video and teleconference call. You can get participation information at https://www.cityofgearhart.com/calendar closer to the hearing date.

File #24-08CU – Conditional Use request for property located at 576 Pacific Way and further described as Assessors Plat 6.10.9AA, Taxlot 0700. The request is to expand a variety shop use in the Neighborhood Commercial C-1 Zone.

Criteria relevant to the Conditional Use request are Gearhart Zoning Ordinance Article 3 (Section 3.4, C-1 Neighborhood Commercial Zone), Article 6 Supplementary Provisions, Article 8 Conditional Uses, Article 13 Administrative Provisions, the Gearhart Comprehensive Plan and Transportation System Plan.

A copy of the application, all documents, staff reports, evidence relied upon, and applicable criteria pertinent to the requests will be available for review and may be obtained seven (7) days prior to the hearing on the city website www.cityofgearhart.com and Gearhart City Hall at the office of Angoleana Torres, 503-738-5501. Copies may be obtained at a reasonable cost. All interested parties are invited to express their opinion for or against the request at the hearing, by letter addressed to the Gearhart Planning Commission. P. 0. Box 2510, Gearhart, Oregon 97138, or by email at planning@cityofgearhart.com received by 5:00 p.m. the Tuesday prior to the hearing. The public hearing will be conducted in accordance with Section 13.050 of the Gearhart Zoning Ordinance.

Any person testifying may appeal the decision; however, failure to raise an issue, including constitutional or other issues regarding conditions of approval, with sufficient specificity to afford the City and parties to the request an opportunity to respond to the issues precludes appeal on said issue to the State Land Use Board of Appeals (LUBA), or to seek damages in circuit court due to a condition of approval.

Angoleana R. Torres Mail/Publish 11/21/2024
Gearhart Planning Commission
City of Gearhart PH121224
Published: November 21, 2024

Posted Online 29 weeks ago

Published in the The Daily Astorian

Featured

PUBLIC

PUBLIC

PUBLIC NOTICE
The commissioners of Pacific County Fire Protection District #4 invite you to attend our yearly public hearing (RCW chapter 84:55) on the
revenue sources for the district's 2024-2025 expense budget. Join us at the Naselle Fire Department on October 21st, 2024 at 6:00 P.M.
Angila Gaines, District Secretary
Pacific County Fire Protection District #4
Published October 9/16, 2024
Legal No. 125-24

PUBLIC NOTICE
The commissioners of Pacific County Fire Protection District #4 invite you to attend our yearly public hearing (RCW chapter 84:55) on the
revenue sources for the district's 2024-2025 expense budget. Join us at the Naselle Fire Department on October 21st, 2024 at 6:00 P.M.
Angila Gaines, District Secretary
Pacific County Fire Protection District #4
Published October 9/16, 2024
Legal No. 125-24

Posted Online 35 weeks ago

Published in the Chinook Observer

View more
Check back daily to see new goods and services, or to sell more stuff. Place an Ad
  • © 2025 by Coast
Powered by Powered by AdPerfect